20-054 Development and Pump Testing for PW1 Production Well

Closing Time

During development of the River’s Edge Subdivision multiple wells were drilled into both a middle and lower aquifer to gain a water source for the subdivision.

The water system was constructed in 2004 and transferred to the Regional District of Nanaimo (RDN) upon registration of the lots. Since then the RDN has been operating and maintaining the system.

The water service area has now developed further, and water demands have increased. As such, the RDN is now interested in investigating the addition of well PW1 to the water system’s supply.
As such, the RDN is now inviting Tenders for the development and pump testing of PW1.